Projects
Project Information
Client : Anglo Gold Ashanti
Location : Khuma in Klerksdorp North West Province
Status :Completed
Value :R6 627 963.17
Construction of a New Maternity Clinic in Khuma
The Construction of an approximately 730 m2 in floor area for a new maternity clinic at Botshabelo clinic. The clinic consisted of face brick structure with a light weight metal roof structure with coloured IBR profile steel roof sheeting. Internal finishing included face brick finish to the walls, fibre cement ceiling, the floor coverings were a combination of vinyl floor tile and ceramic floor tiles.
Project Information
Client : LYT Architecture on behalf of Rhodium Reefs Limited
Location : Lydenburg and Steelpoort Mpumalanga Province
Status : Completed
Value : R106 202 500.00
Housing Development at Lydenburg and Steelpoort
- Bulk infrastructure including Bulk Earthworks, Roads, Storm- water, Sewer, Water and Electrical Reticulation for the Housing Development
- The construction of 64 freestanding residential units. The size of the units ranged from 119m 2 to 300m 2
- The construction of various buildings on a Mine, which included an Administration building, 2No. Laboratories, Plant offices, Change rooms and Security Building
Project Information
Client : Ekurhuleni West TVET College
Location : EWC Kathorus Campus Katlehong
Status : Completed
Value : R47 496 634.00
Construction of a New Auditorium and Hall
The Construction of New Auditorium and Hall, with kitchen and ablution facilities approximately 1556m2. The structure comprising of reinforced concrete columns with infill brickwork with plaster and paint externally and internally, Stone cladding in sections, Steel roofing sheeting, aluminum windows and shopfronts externally, timber doors internally. The floor finish consists of a combination of tiled floors and carpeted floors on sand cement screed.
Project Information
Client : Chiefton Facilities Management (Pty) Ltd
Location : Erf 514, 515 and 516 Annadale Ext 2, Polokwane City
Status : Completed
Value : R240 394 968.28
Construction of the Ga-Rena Township and Housing Development Phase 2
The Construction of Ga-Rena Township and Housing Development (Phase 2) comprises of the construction of 494 units split among 11 blocks, each three storeys high.
The project consists of the bulk infrastructure for the township and housing development in the Polokwane area. The bulk infrastructure includes Bulk Earthworks to level out the site, Roads with parking, Stormwater inclusive of an Attenuation pond, Sewer, Water and Electrical Reticulation to the site. Furthermore, the construction of Drying yards, General Dealers and Gate Houses for the Township.
The construction of the blocks comprises of brick walls, rib & blocks concrete slabs, Facebrick external façade, plaster and painted walls internally, timber roof construction with “Klip-Lok” steel roof sheeting with “Chromadek” finish, semi-solid doors internally, framed doors externally, carpets in bedrooms and floor tiles in all other areas, mild steel windows throughout, bathroom and kitchen installations with their various sanitary fittings, plastered and painted ceilings.
Project Information
Client : Gauteng Department Of Infrastructure Development
Location : Kagiso Krugersdorp Gauteng
Status : Current
Value : R222 756 727.50
Construction of New 24 hour Community Health Clinic
The project consisted of the construction of a 9 200m2 Community Health Clinic, with a full suite of services including trauma, Labor, Neonatal, Psychiatric, Dental, Pharmacy and Ancillary Services.
The hospital was designed as a single storey structure with inter leading passages connecting the various service units of the hospital. The external faced comprised face brick with aluminum windows. Internal finishes ranged from plaster and paint to tiled surfaces. The roof was constructed of a structure steel truss system with colored metal roof sheets.
Project Information
Client : Anglo Gold Ashanti
Location : Lutshaya Village, Eastern Cape
Status : Completed
Value : R5 Million
Construction of Community Hall in Lutshaya
The Construction of New Community Hall, with kitchen and ablution facilities approximately 750m2. The structure comprising a structural steel frame with face brick cladding internally and externally, Steel roofing sheeting, metal windows and timber doors. The floor finish consisted of vinyl floor coverings on sand cement screed.
Project Information
Client : Arcelor Mittal South Africa Distribution Systems
Location : Wilge, Mpumalanga Province and Memel, Free State Province
Status : Completed
Value : R73 Million
Sibongindawo Primary School in Wilge and Umcebo Primary School in Memel
The project entailed the construction of a 2No. 300 learner Primary Schools utilizing Alternative Building Technologies (ABT). AMSA-SA had developed a system of insulated panels which were then fixed to a steel structural frame. The School was developed to be self-sustaining and is completely “off-grid” powered by Solar panels which are located on the site. The bulk infrastructure included Bulk Earthworks, Terracing, Roads, and Storm- water, Sewer, Water and Electrical Reticulation.
Project Information
Client : Bakubung Platinum
Location : Rustenburg , North West Province
Status : Completed
Value : R397 094 654.59
The Infrastructure Development and Construction of 801 Residential Units for Wesizwe Platinum Mine
The project consisted of bulk infrastructure for a housing estate in the Rustenburg area. The bulk infrastructure included Bulk Earthworks, Roads, and Storm- water, Sewer, Water and Electrical Reticulation. The residential units consisted 801 units with a combination of free standing units and low rise blocks. The size of the units ranged from 80m 2 to 260m 2 , with up market fittings and finishes.
Project Information
Client : Grey Apple (Pty) Ltd
Location : Portion 66 (A Portion of Portion 4) of the farm Drienfontein NO.137 Mpumalanga Province
Status : Current
Value : R340 235 504.00
Construction of the Driefontein Social Housing Development Phase 1A
Phase 1A is part of a larger mixed housing development spreading over 20 Hectares of land, comprising Social Housing units, Student accommodation and Freestanding houses to cater for the various LSMs within the Secunda housing market. Phase 1A comprises of the construction of 800 units split among 1 and 2 bedroom units. The bulk infrastructure includes Bulk Earthworks to level out the site, Roads with parking, Stormwater inclusive of an Attenuation ponds, Sewer, Water and Electrical Reticulation to the site. The construction of the blocks comprises of brick walls, precast concrete slabs, combination of Facebrick and bagged external façade, plaster and painted walls internally, timber roof construction with “Klip-Lok” steel roof sheeting with “Chromadek” finish, semi-solid doors internally, framed doors externally, floor tiles throughout the unit, mild steel windows, bathroom and kitchen installations with their various sanitary fittings, plastered and painted ceilings.
Project Information
Client : Ekurhuleni East TVET College (EEC)
Location : EEC Kwa-Thema Campus, Kwa-Thema
Status : Current
Value : R103 348 200.00
Construction of a New Fitness Centre and Media Centre
The Construction of New Fitness Centre and Media Centre, the project scope comprises of inspection of existing Municipal approved plans, preliminary investigations and detailed design of all outstanding information on both the Media and Fitness Centre. The Fitness Centre comprises of a gymnasium, swimming pool, offices, the ablution blocks and the spa room. The external façade of the building is made of a structural steel and brickwork that is finished with plaster and paint internally and stone cladding externally. The Media Centre comprises of a hall and auditorium, and the block of offices.
Project Information
Client : Ekurhuleni West TVET College
Location : EWC Kathorus Campus, Katlehong
Status : Completed
Value : 4 700 000.00
New Student Support Centre
The Construction of New Student Support Building, with kitchen ablution facilities, First Aid, boardroom and Offices approximately 251m2. The structure comprising a face brick walls externally and plaster and painted walls internally, steel roofing sheeting, aluminum windows and timber doors. The floor finish consists of tiled floors on sand cement screed.
Project Information
Client : Lonmin Platinum
Location : K4 Shaft, Marikana, North West Province
Status : Completed
Value : R125 305 456.00
The K4 Shaft Infrastructure Upgrade
The Project entailed the construction and rehabilitation of all surface infrastructure at K4 Shaft. This included the construction of Administrative buildings, HR Offices, New 5000 man industrial changes houses in four blocks, security gatehouses and new lamp room. Ancillary buildings included a Taxi rank, hawker’s stalls, and bus depot, the upgrade of roads as well as new sewer and water reticulation. The construction of buildings varied from conventional brick and mortar structures with timber roofs to structural steel portal framed industrial buildings.
Project Information
Client : Johannesburg Development Agency
Location : Corner Stilt and Rietduiker Streets, Rabie Ridge, Johannesburg
Status : Completed
Value : R20 814 111.81
Construction of Sporting Facilities and related works for the Community of Rabie Ridge.
The scope of the works entailed, the upgrading of bulk services, (water, sewer, storm water and electrical) to the existing sport facility. Construction of two Futsal courts and upgrade of two soccer pitches, new tennis and basketball courts, construction of new roads, paving and landscaping and irrigation to the facility. Construction commenced in February 2017 and completion was achieved in November 2017.
Project Information
Client : Vaal University of Technology (VUT)
Location : Vaal University of Technology – Main Campus, Vanderbijlpark.
Status : Current
Value : R95 493 893.00
Extension to Engineering Block RE: Additional Floor on Engineering Wing
The Extension to Engineering Block comprises of the alterations of internal divisions, floor finishes, new suspended ceilings and the addition of a 2 nd floor to the building to increase laboratory capacity. The additional floor includes a structural steel frame with brick infill and structural steel roof with chromadek sheeting. The external façade comprises of face brick and aluminium windows and shopfronts. The additional floor has been designed to match the existing.
Project Information
Client : Vaal University of Technology
Location : Vaal University of Technology – Main Campus, Vanderbijlpark.
Status : Completed
Value : R51 219 559.29 (Incl VAT)
Construction of Disability Unit and African Languages Centre
The Construction of Disability Unit and African Languages Centre comprising of three floors, part concrete and part structural steel roof, plastered brick façade with sections of face brick. Internally plaster and paint, suspended ceilings with bulkheads in certain areas. The building comprises mainly of offices and laboratories, but also boasts an auditorium, boardroom and open learning areas.
Project Information
Client : Lonmin Platinum
Location :Rustenburg/Amandelbult/Union
Status : Completed
Value : R135 000 000
Single Quarter Developments
The refurbishment and alterations of existing hostel blocks within Middelkraal and Wonderkop Hostels consisting of reconfiguring the units into bachelor units with new floor, wall and ceiling finishes and new sanitary fittings.
Project Information
Client : Lonmin Platinum
Status : Completed
Value : R634 000 000
Housing Development incl. Infrastructure Development
Marikana Housing Development – 5000 Houses: Feasibility costing to have been included in the clients feasibility study for budget purposes.
Project Information
Client : Lonmin Platinum
Location :Union/Northam/Amandelbult/
Thabazimbi/Atok/Burgersfort
Status : Completed
Value : R250 000 000
Mine Staff Housing
Various single-storey mining houses comprising of face brick walls, concrete roof tiles, raft slabs, aluminum windows, etc.
Project Information
Client : SNC Lavalin / TPSP
Location :China
Status : Completed
Value : Confidential
TFC Charge Chrome Project
Pre-Contract QS Services for the infrastructure development at the TFC Charge Chrome Project, China
Project Information
Client : Ekurhuleni Metropolitan Municipality
Location : Ekurhuleni Metropolitan Municipality
Status : Completed
Value : Confidential
Ekurhuleni Building Audit
Audit of existing offices owned by the Ekurhuleni Municipality